Send Message
Home ProductsWater Well Drill Pipe

20FT Wall Thickness 8.56 R780 Water Well Drill Pipe OD 3.5inch

Certification
China Langfang Baiwei Drill Co., Ltd. certification
China Langfang Baiwei Drill Co., Ltd. certification
Customer Reviews
After-sales service is always a swift response, which makes the cooperation between us very at ease. We and lang way are friends forever.

—— Samy

We have cooperated with langway for many years, Ms.lily Gao, the sales manager of langway, has a very good service, both the delivery time and the quality of the products are very good, this is my best experience in China, thank you.

—— Satyajt

Langway's technology is very good, improving the construction time, reducing the construction cost for us, and gaining more local praise for us.

—— Hamzepour

I'm Online Chat Now

20FT Wall Thickness 8.56 R780 Water Well Drill Pipe OD 3.5inch

20FT Wall Thickness 8.56 R780 Water Well Drill Pipe OD 3.5inch
20FT Wall Thickness 8.56 R780 Water Well Drill Pipe OD 3.5inch

Large Image :  20FT Wall Thickness 8.56 R780 Water Well Drill Pipe OD 3.5inch

Product Details:
Place of Origin: Hebei China
Brand Name: BaiWei
Certification: ISO9001
Model Number: 3.5"
Payment & Shipping Terms:
Minimum Order Quantity: 30pcs
Price: Negotiable
Packaging Details: According to customer needs
Delivery Time: 10-15 working days, which will be adjusted according to different products and inventory
Payment Terms: T/T

20FT Wall Thickness 8.56 R780 Water Well Drill Pipe OD 3.5inch

Description
Type: Drill Pipes Machine Type: Drilling Equipment
Material: High Manganese Steel Processing Type: Forging
Use: Well Drilling Application: Well Drilling,DTH Drilling, Coal Drilling, Quarrying
Pressure: High Pressure Diameter: 50mm To 159mm
Length: 15FT/20FT/25FT Advantage: High Performance
Color: Request Usage: Well Drilling
Highlight:

20FT Water Well Drill Pipe

,

Water Well Drill Pipe 3.5inch

,

seamless drill pipe 3.5inch

20FT Wall Thickness 8.56 R780 Water Well Drill Pipe OD 3.5”

 

Product Description

 

1.Big rigidity

2.Good sealing capacity

3.Flat outer structure

4.Low torque and resistance when rotating

 

 

OD
A
Wall
B
Length
L
Weight
lbs
ID
Pin C
Across
Flat D
Flat
Length E
Dist From
Shoulder F
Flat
Length G
Across
Flat H
Connection
3.5" .315" 20' 245 1.75" 2.75" 12.5" 3.25" 2.25" 3.25" 2 3/8IF
4.5" .337" 20' 345 1.75" 3" 12.5" 3.25" 2.375" 4" 3 1/2 Reg
4 1/2" .337" 20' 345 2 1/8" 3" 12 1/2" 3 1/4" 2 3/8" 4" 2 7/8 IF
4 1/2" .337" 25' 430 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
4 1/2" .337" 25' 430 2 1/8" 3" 12 1/2" 3 1/4" 2 3/8" 4" 2 7/8 IF
4 1/2" .337" 30' 510 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
4 1/2" .500" 25' 510 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
4 1/2" .500" 30' 615 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
4 1/2" .750" 25' 805 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
5" .500" 25' 695 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
5" .500" 30' 775 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
5" .750" 30' 1100 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
5" .750" 25' 930 1 1/2" 3" 12 1/2" 3 1/4" 2 3/8" 4 5/8" 3 1/2 Beco
5 1/2" .750" 25' 1045 1 1/2" 3" 12 1/2" 3 1/4" 2 3/8" 4 5/8" 3 1/2 Beco
5 1/2" .750" 30' 1240 1 1/2" 3" 12 1/2" 3 1/4" 2 3/8" 4 5/8" 3 1/2 Beco

 

 

Drill pipe usage notes

 

1. When using a new drill pipe, make sure that the screw thread of the front section of the drill bit (protecting the shaft head) is also a swivel close to the new ring thread, which will easily damage the screw thread of the new drill pipe, resulting in water leakage, snap, loosening and other conditions.
2. When the drill pipe is used for the first drilling, it is necessary to "grind new threads", which includes first smearing thread oil, then fully screwing with the drill, then opening the threads, and then smearing thread oil and opening again. Repeat this for three times to avoid new wear and snap.
3. Keep the drill pipe as straight as possible under the ground and on the ground, so as to avoid unnecessary wear and tear on the side of the screw thread, or even tripping. It is very important to anchor the drill well to avoid force movement during construction.
4. When making up, screw it slowly to reduce overheating wear.
5. When making up each time, it must be tightened with full torque, and always pay attention to whether the clamp is in good condition.
6. Shorten the distance of the drill into the ground opening, because if the drill pipe is lack of support, it will be easy to bend and deform the drill pipe when it is pushed and guided, resulting in shorter service life.
7. Keep the inlet angle as small as possible, and slowly change the angle according to the safety requirements of drill pipe.
8. Do not exceed the maximum bending radius of the drill pipe, and pay special attention to the change in horizontal section during drilling and the change in angle during drilling.
9. The drill pipe shall be used in turn to avoid the fixed drill pipe from guiding and expanding. It must be used in turn to avoid breaking the pipe due to excessive wear.

 

 
 
20FT Wall Thickness 8.56 R780 Water Well Drill Pipe OD 3.5inch 0

 

Our Services

1. Drill pipe strictly in accordance with ISO9001 standard

2. If you find a quality problem within one month of the package being returned.

3. All obligations and responsibilities are strictly performed in accordance with the contract

4. 24-hour online customer service, feel free to contact us.



 

 

Contact Details
Langfang Baiwei Drill Co., Ltd.

Contact Person: Lily Gao

Tel: +86-17736713473

Fax: 86-0316-6657011

Send your inquiry directly to us (0 / 3000)